The dual 12 - 28V power input cables and dual ground cables must be pre cisely
soldered to the corresponding pads in strict accordance with the po sitions. Do not
solder only one of the cables to ensure stable power trans mission of the device.
Before powering on, make sure to complete the installation of the antenna connector
and the antenna. Avoid device failures or performance degradat ion caused by non -
installation.
The device's heat sink plays a crucial role in heat dissipation. Any removal is strictly
prohibited to prevent device damage due to overheating.
To achieve good heat dissipation effect, please install the Video Transmitt er (VTX) at
the uppermost part of the drone frame. This can ensure suffici ent airflow for heat
dissipation.
This video transmitter has a PIT mode (low - power mode), and the operati on methods
are as follows:
1.With the help of the Betaflight ground station software, it is convenient to enter and exi t the PIT mode.
2.In addition, pressing and holding the device button for 15 seconds can also exit the PIT mode.
3.If the PIT mode is not actively exited, the device will still remain in the PIT mode when powered on next
Cable Connector
JST 8pin (Dual 12-28V Input and Dual GND)
time